Terms of Service
The conditions that govern every FurnifyLab project, written as plainly as a good shop drawing.
Last updated: 23 September 2026
01. Acceptance of terms
By engaging FurnifyLab for furniture execution, you agree to these terms in full. Together with your signed quotation, they form a binding agreement between you and FurnifyLab.
Our services are intended for residential and commercial projects that need specialised material knowledge and architectural rigour.
02. Project scope & revisions
Every project begins with a design brief. FurnifyLab provides drawings and material specifications for your approval before production starts.
- Standard engagement includes up to three (3) rounds of major revisions to the initial design proposal.
- Material changes requested after procurement will incur additional cost and timeline adjustments.
- Timelines are estimates based on craftsman availability, site readiness and material supply schedules.
03. Payment terms
Deposit
A non-refundable 50% deposit is required to start material procurement and scheduling.
Final payment
The balance is due on completion of production, before final installation or delivery.
Online payments are processed through a secure, regulated payment gateway. Prices are exclusive of GST unless stated otherwise.
04. Intellectual property
All designs, drawings and custom furniture concepts remain the property of FurnifyLab until final payment is received and title is transferred.
This includes CAD files, material specifications and joinery details developed during the project.
05. Liability & warranty
FurnifyLab provides a 3-month workmanship assurance from the date of handover on all custom structural elements.
Included
- Structural joinery failure
- Adhesive delamination
- Manufacturing defects
Excluded
- Natural wood movement and checking
- Accidental damage or misuse
- Water, heat or environmental exposure
06. Governing law
These terms are governed by the laws of India. Any dispute will first be addressed in good faith; if unresolved, it will be settled by arbitration under the Arbitration and Conciliation Act, 1996, with the seat of arbitration in Jaipur, Rajasthan.